IWPC Home Page

 

NEW - International Wireless Industry Consortium
Interactive Technical Workshop

Limited to 100 seats
First Registered, First Served

 

 

Table of Contents

 

Agenda

 

Register

 

Deadline for Presentation Materials

 

Costs/Registration Fee for Members

 

Hotel Information

 

Dress Code

 

Handout Material

 

Options for Members

 

 

Improving Tower Top Electronics Reliability

 

From Design, Installation, Operations, and Maintenance

 

Keynote By: 

 

And Tour: US Cellular NOC and Datacenter

 

With Carrier Participation

See full size image
See full size image See full size image

 

October 26-29, 2010

 

Westin Chicago Northwest
400 Park Boulevard
Itasca, IL  60143
1-630-773-4000
1-888-627-8510

 

 

Click HERE to Register

 

Moderated by:
Don Brown, Director, IWPC

Mike Alferman, IWPC

 

Workshop Background:

As LTE deployments roll out in the near future, smarter and more complex, active and passive electronics are required at the top of the cell tower. Failures of these more expensive electronics have a significant impact on the operator’s CapEx and OpEx because field replacements require tower climbs that are 5-10 times more expensive than ground or rooftops repairs (where no tower climb is required) and may cause delays in schedule of up to 6 months.

 

The industry aims to improve reliability of the design, installation, operation and maintenance of tower top electronics to minimize the operator’s total cost of ownership. In November 2008, the IWPC established a working group led by Andrew, Smiths Interconnect, Ubidyne, and Westower to address these reliability challenges. The goals of the working group are:

  • Create an objective reliability test protocol; specifically for "electronics up the mast" via Reliability Test Requirements Document

  • Develop a common, relevant library of prediction tools and guidelines that correlate to industry experienced failure rates via Reliability Prediction Guidelines Whitepaper

  • Develop and implement a process for collection and sharing of industry data to help "raise the bar" on reliability of tower top electronics experienced by mobile operators via an anonymous survey by the tower top electronics OEM who has agreed to provide field failure data.

This workshop is a culmination of these activities including presentations by the whole tower top electronic ecosystem and learning of the latest advancements in reliability.

Workshop Goals:

The Goal of this workshop is to gather all members of the supply chain that represent the product lifecycle of tower top electronics - design, installation, operations, and maintenance:

  1. Explore new ways to lower Operator’s CapEx and OpEx

  2. To evaluate lessons learned and the state of the art of tower mounted electronics.

  3. To clearly identify what the industry needs to do to provide more reliable tower top electronics

AND – move the IWPC’s Tower Top Electronics Reliability (TTER) Working Group activities forward.

 

 

 

Tuesday, October 26, 2010

7:30 PM to

9:00 PM

Social and Networking
Reception & Registration

 

At Hotel

Wednesday, October 27, 2010

7:00 AM

Breakfast & Registration

 

 

8:00 AM

Opening Remarks

IWPC Opening Remarks

Director

IWPC

 

8:20 AM

Self Introductions

Each person will be asked to introduce him/herself and share how they can contribute to this process

9:00 AM

Keynote presentation

  • Looking down the road at Tower Top Electronics (TTE)

The Benefits and Potential Drawbacks of Deploying Tower Top Electronics for 4G: An Operator View

DMTS, Technology Development

US Cellular

 

9:45 AM

Networking Break

 

 

10:25 AM

Tower Top Electronics Reliability (TTER) Working group Overview

  • Background

  • Status of Deliverables

    • Test Methods for Reliability

    • Reliability Prediction

    • Data Collection and Explanation

  • Next Steps – Moving the working group forward

IWPC Tower Top Electronics Reliability Working Group Status

Leadership Team

 

Ubidyne

Andrew

Smiths Interconnect

 

11:00 AM

Operator Views of
Tower Top Electronics (TTE)

  • System Issues of TTE

    • Active or Passive TTE

      • RF Coax vs. Fiber Considerations

      • Related Reliability Issues

      • Related Cost Issues of CapEx and OpEx

    • Pros and Cons for using TTE

      • OPEX and CAPEX saving?

      • Adding size and weight to the towers?

      • Possibly adding to tower rental costs?

      • Geographical considerations?

        • North American views

        • European views

        • Asian views

    • What scenarios and use case are best to deploy TTE vs. Roof Top vs. Ground Base Equipment?

      • LTE versus Legacy 2G and 3G

      • Roof top versus existing tower versus greenfield tower builds

    • What are the causes of failure?

    • What percentage of TTE is used because tower is overloaded?

    • What percentage of TTE is used because improved link budget is needed?

    • What are the circumstances that TTE is NOT used by the operator?

  • Installation

    • What are the most reliable and unreliable parts of the TTE installation?

      • TME

      • Connectors

      • Cabling

      • Other

    • What additional validation is needed besides PIM and DTF to verify TTE installation?

  • Operation

    • What is the impact of collocation on TTE reliability?

    • How often does lightning effect tower equipment?

      • Direct versus indirect strikes

  •  Maintenance

    • Where should TTE alarms/notifications received by the Operator?

      • Base station

      • NOC

      • Impact of SON on TTE reliability?

      • Other

    • What new types of alarms and notifications would the operator want to be available?

    • How much does No Trouble Found (NTF) cost the operator?
      What are the recommendations to provide feedback to the supply chain to reduce NTF?

    • What is desired from the supply chain to increase TTE Reliability?

Can You Hear Me Now?

DMTS/RF Technology, RF Network Planning

Verizon Wireless

 

AT&T’s Perspective of the Requirements for TTE Exceptional Reliability & Graceful Durability

Principal - Product Development Engineer

AT&T

 

 

12:30 PM

Networking Lunch

 

 

1:30 PM

Installer Views

 

  • How do Installers feel about tower vs roof vs ground mounted electronics?

  • What is the solution to avoid under/over torquing the connectors?

  • How can the TTE be better designed for easier installation and maintenance?

    • Handles

    • Connectors

    • Right angle versus Straight

    • Eliminating Torque

    • Standardization

  • Cable Assembly

  • Better indicators on TTE

  • What improvements in diagnostic tools are desired for field installers?

  • How can tower top platforms be made more consistent and installation friendly?

    • Monopole

    • Lattice Towers

    • Power Poles

  • Fiber vs. Coax tradeoffs

  • Best practices for avoiding water ingress

The Truth from the Field on Installation Reliability - Coax vs Fiber, Active vs Passive Electronics

VP, Sales and Marketing

WesTower Communications

 

Benefits of Fiber-From-The-MTSO-To-The-Antenna

VP, National Fiber

Byers Engineering 

and

Market Development Manager

Corning Cable Systems

 

 

2:40 PM

Panel - Operators and Installers

 

Confirmed

  • AT&T

  • Byers Engineering

  • Corning Cable Systems

  • T-Mobile

  • US Cellular

  • Verizon Wireless

  • WesTower

 

3:40 PM

Networking Break

 

 

4:10 PM

Oem Views - Tradeoffs of Ground vs. roof tower top electronics
 

Lessons Learned – good and bad – of tower mounted electronics

  • What are the case studies for TTE?

    • Link Budget Analysis

    • OpEx vs. CapEx Tradeoffs

    • Total Cost of Ownership

  • Design

    • What are the advancements in protocols such as AISG 2.0, CIPRI, OBRI, and OBSAI and how do they impact TTE reliability?

    • What are the advancements in TTE reliability?

      • Reduction of number of parts

      • Redundancy Improvement

    • How are designs being improved to reduce no trouble founds (NTFs)?

  • Installation

    • What base station diagnostic tools are available at time of install?

    • What are new alarming/diagnostic capabilities to determine:

      • The right power at all connectors

      • Integrity of multiple units – daisy chaining or hub and spoke

  • Operation & Maintenance

    • How do remote diagnostics improve troubleshooting the equipment from the ground?

    • How does field failure data get back to the supply chain to reduce NTF?

 

Recent Improvements in Tower Top Electronics Reliability and Economics

DMTS, Wireless Networks

Alcatel-Lucent

 

RRU Deployment in Canada

RF Technology

Huawei

 

 

 

 

5:10 PM

Adjourn for Day

 

 

7:00 PM

Bus leaves for:

 

Dinner

Chicago Style

Bus Transportation provided to and from hotel.

Thursday, October 28, 2010

7:00 AM

Breakfast

 

 

8:00 AM

Sub-System Manufacturer's view of
TTE Reliability

(Antennas, Diplexers, TMA’s, Remote Radio Heads,
Remote Electronic Tilt (RET))

  • Design

    • What architectures can improve TTE reliability?

      • Antennas, TMAs, RRHs, and RETs

    • What are the advancements in reliability?

      • Reduction of number of parts

      • Redundancy Improvement

    • What are the latest improvements?

      • Lighter and Smaller

      • Durability

      • Easy of handling

      • Cooling

  • Installation

    • How can installation be made easier for the field installers?

      • Carrying up the tower

      • Connections

      • Cabling

      • Handles

  • Operations

    • What indicators are available to help field troubleshooting?

      • Tradeoffs of indicator reliability vs. unit reliability?

    • What advancements in enclosures, weatherproofing, cooling, etc.

    • How is field failure data used to improve subsequent designs?

  • Maintenance

    • How can no trouble founds (NTFs) be reduced?

    • What are new alarming/diagnostic capabilities reporting back to base station and NOC?

    • What advancements are available for better management of TTE?

      • CPRI - Common Public Radio Interface

      • OBSAI - Open Base Station Architecture Initiative

      • OBRI - Open BBU RRH Interface

      • AISG 2.0 - Antenna Interface Standards Group

 

The Site as a System - Holistic View of Service Availability

VP/Marketing and Business Development

Ubidyne

&

Manager - System Reliability Assurance

Andrew

 

Corrosion and Failure Physics

Sr. Manager, Quality & Reliability Engineering

Powerwave Technologies

 

Lessons Learned from the Real World

Dir., Mktng & Tech. Services

Radio Frequency Systems

 

Solving Tower Top Overload/Reliability Problems - Adding Services, Capacity and Bands by Upgrading Antennas, not Adding Antennas or Active Components

CTO Americas

Quintel Solutions

 

 

 

10:10 AM

Networking Break

 

 

10:50 AM

Cables & Connectors Views-
Coax, Fiber, DC power, Ethernet

  • What connectors work best for different installation tower top electronic scenarios?

    • Fiber

    • Coax

    • DC Power

    • Ethernet

  • What field failure analysis can be provided due to the following:

    • Water Ingress

    • Lightning

    • Torquing

  • What advancements exist to solve:

    • Under/over Torquing

    • Water Ingress Prevention

  • What advancements in cable and connectors are available to help installers?

Passive Intermodulation Distortion: The Enemy Beneath The Surface

Technology Manager

Spinner North America

 

Fibre-to-the-Antenna (FttA)

& New and Future Technologies

Global Market Manager FttA

and

Global Market Manager for Corrugated Cell Site Solutions

Huber+Suhner

 

Does a 0.5 dB Coax Cable Loss Reduction Change System Design Thinking?

Senior Research Engineer

Dow Chemical Co.

 

12:20 PM

Networking Lunch

 

 

1:20 PM

Testing and PIM - Installation and maintenance

 

  • How can testing improve reliability of TTE installation?

  • How does PIM effect installation of TTE?

  • What are the latest advancements in testing?

 

Base Station Field Testing Goals

Business Unit Manager

Anritsu Corp.

 

Passive Intermodulation (PIM) Testing Sites with Tower Top Electronics

VP, Business Development

Summitek Instruments

 

2:20 PM

Networking Break

 

 

3:00 PM

Materials, Packaging & Enabling Technologies
for Improved Reliability

  • Cooling Technologies

  • Enclosures

  • Materials

  • Packaging

  • Semiconductors

  • Lightning Protection

Environmental Impact on the Performance of High Frequency PCB Materials

Market Development Engineer

Rogers Corp.

 

Lightning Protection Update

VP,Global Engineering & Product Management

Smiths Protection Technology Group

 

Semiconductor Contributions to Improved Tower-Top Reliability

Systems Applications Manager

Analog Devices

 

4:30 PM

CLOSING PANEL Session

Operators

  • The Operators will be asked to recap the extent to which the workshop has addressed their wish lists.
     

  • What are the next steps?

 
  • AT&T

  • U.S. Cellular

  • Verizon Wireless

  • T-Mobile

5:15 PM

 

TakeAways & Closing Remarks

 

 

6:00 PM

Adjourn

 

 

7:00 PM

Dinner (Dutch*)

 

* = in this context, Dutch is a term which means that each person will be responsible for their own dinner costs.

For those who desire to join us, we get together to enjoy good friends, good food, good wine and [really] bad jokes

Friday, October 29, 2010

7:00 AM

Breakfast

 

 

8:00 AM - to

Noon

IWPC Tower Top Electronics Reliability

Working Group Session

 

http://www.iwpc.org/Workshop_Folders/10_10_TowerTop/TTER_WG_MEETING.htm

  • How do we close the loop? What are the next steps?

  • Feedback from the supply chain

  • How do we socialize the documents to drive acceptance?

  • Looking at whole site as system and reliability as a whole, can we create any tools for OEMs or other companies to provide this reliability?

Agenda

  • Introduction of Working Group

  • Review of Current Documents/Processes

  • Test Methods for Reliability

  • Reliability Prediction

  • Data Collection and Explanation

  • Discussion: Possible other Areas of Focus

  • Task Force Break-out Groups

  • Report of Breakout Groups

  • Next Steps for TTER WG

 

 

 

1:00 PM

Tour of

US Cellular Network Operations Center (NOC) and Datacenter
 

Note:  Restrictions may apply--
tour attendance subject to US Cellular's approval

Bus Transportation provided from and to hotel. 

 

Bus to depart from the hotel at 1:00 pm and return back to the hotel approximately 3:30 pm

 

     

 

DEADLINE FOR HANDOUT MATERIALS:

Deadline for electronic version of handout materials: 

 

Friday, October 15, 2010

 

COSTS/REGISTRATION FEE:

ALL Hosts, Speakers, Panel Members and Attendees will be asked to cover out of pocket workshop costs such as conference room costs, food (Social Reception plus First Day breakfast/lunch/dinner plus Second Day breakfast/lunch plus 4 Breaks), booklet copying, audio/visual costs, etc.

 

We estimate that these costs will be $749. USD per person. (For IWPC Members, only.)

 

ALL Hosts, Speakers, Panel Members and Attendees will be asked to pay this fee in advance with either Visa, Mastercard, American Express, cash, personal check or business check.

 

Make checks payable to IWPC.

 

HOTEL:

 

Westin Chicago Northwest
400 Park Boulevard
Itasca, IL  60143
1-630-773-4000
1-888-627-8510

 

 

Please contact the hotel directly for reservations. Mention the IWPC room block rate of $125.00 single occupancy.

 

You can also make your hotel reservations on-line at:

 

http://www.starwoodmeeting.com/Book/IWPC

 

 

Cut-off date for reservations is Friday, October 8, 2010.   After that date rooms cannot be guaranteed at the IWPC rate.

 

The Westin Chicago Northwest is located just 12 miles from O'Hare International Airport.

 

 

AUDIO VISUAL:

A Computer Projector will be available for the speakers.

In addition, we audiotape all presentations and the interactive discussions. Post workshop, presentations are made available to IWPC Members on the IWPC WEB site, along with “movies” of all presentations and panel sessions.

 

BUSINESS CARDS:

Business cards will be collected at the door from all attendees. We will make copies of these cards, which will be available to all who provided a business card.

 

DRESS:

Business casual suggested. No ties, please !!

 

HANDOUT MATERIALS:

IWPC prepares a handout binder with ALL presentation materials delivered to the IWPC on or before the deadline.

For ALL IWPC members:

All IWPC members are invited to submit a maximum of 4 pages of materials to include in this handout binder. These pages should NOT BE SALES MATERIALS. Rather, we suggest it contain technical information about your technology as it relates to the workshop topics.

For all companies who will be making a presentation at the Workshop:

You are invited to submit an advance copy of your presentation, complete with graphics and illustrations.

These materials will be copied and handed out at the workshop and included in the IWPC Web site.

Please submit these materials either by email, as a Word for Windows file, Power Point files or PDF files.

 

or use this FREE FTP Site for files greater than 5 MB

http://www.iwpc.org/cal/sitedrop.asp 

 

Click HERE to Register