A New Approach to PLL/VCO's, Supporting Multiple Air Interface Standards
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
0.66 MB
|
|
A Smooth Upgrade Path to 4G
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
3.64 MB
|
|
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
1.52 MB
|
|
BSA Solutions for Evolving Networks
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
1.6 MB
|
|
Delivering a Cost Effective Femto BTS Design Timing Solution for Femtocells
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
0.63 MB
|
|
Delivering Cost Effective Femto BTS Design
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
0.39 MB
|
|
Eliminate "Guessing" With Fastest Femtocell Time to Market
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
0.75 MB
|
|
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
1.85 MB
|
|
Future Proof Antenna Solutions
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
2.2 MB
|
|
High Data Rate Mobile Network Overlays & Base Station Upgrades
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
0.57 MB
|
|
Interoperability and Deployment Challenges for Inter-Vendor Network Overlays
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
1.05 MB
|
|
IWPC Opening Materials High Data Rate Mobile Network Overlays and Base Station Upgrades
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
0.34 MB
|
|
Maximally-Flat IP Network Architectures and The Base Station Router (BSR)
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
0.92 MB
|
|
Multi-Band Solutions for Evolving Spectrum
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
1.33 MB
|
|
New Technology: Picocell Front End Modules
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
0.15 MB
|
|
Next Generation Site Design
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
0.67 MB
|
|
Powering the Next Wave of Growth in Wireless
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
1.12 MB
|
|
RF Semiconductor Devices for Future-Proofing Next Generation Wireless Infrastructure
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
2.8 MB
|
|
RF Subsystem Solutions for Evolving Networks
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
1.63 MB
|
|
Solving the Interoperability Challenges for High Data Rate Overlays with UMB-LTE-mWiMAX
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
1.95 MB
|
|
The Role of Semiconductor in Enabling Low Cost Femtocells
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
0.4 MB
|
|
Verizon's "Wish List" for Seamless Network Upgrades to 4G Antennas
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
0.03 MB
|
|
Executive Summary - High Data Rate Mobile Network Overlays and Base Station Upgrades
|
Size
|
|
|
08/2007
|
|
Infrastructure Equipment
|
0.05 MB
|
|